日韩av高清在线观看丨久久精品国产99国产精品亚洲丨免费观看黄网站在线播放丨精品一区二区三区自拍图片区丨亚洲中字慕日产2020

news

Focus on current issues

What should be paid attention to in the use and maintenance of molds?

Plastic molds are the key molding special tools for plastic products. If the quality of the mold changes, such as: the shape changes, the position moves, the molding surface becomes rough, the clamping surface is not tightly contacted, etc., it will directly affect the quality of the plastic product. Therefore, we must pay attention to the use and maintenance of the mold.

The main points are as follows:
(1) Before production, check whether there are impurities in each part of the mold. Dirt, the paint, impurities and dirt in the mold should be cleaned with cotton gauze, and the firmly bonded residue should be cleaned with a copper knife.

(2) Reasonable selection of the clamping force is based on the fact that no flash is generated when the product is formed. Excessive clamping force will not only increase the power consumption, but also make the mold and transmission parts wear faster.

(3) The sliding parts of the mold, such as guide posts, push rods, reset rods, tie rods, etc., should be oiled twice a day in summer and only once in winter.

(4) When the full-time mold maintenance worker is on duty, the molds in production should be inspected and observed, and problems should be dealt with in time. When taking over the shift, the security worker should start work 5-10 minutes in advance to check the production status of the mold - especially for those molds that often have secondary scraps, more problems and more prominent molds, more attention should be paid.

(5) During production, power failure or shutdown occurs for some reason. If the shutdown is continuous for more than 6 hours, in the rainy season in the south, when the air is humid, it is necessary to spray anti-rust oil on the molding surface, parting surface and sliding surface. In non-rainy season, if the machine is shut down continuously for more than 24 hours, it is necessary to spray anti-rust lubricant on the molding surface, parting surface and sliding mating surface of the mold. The molds that need to be put into storage that are not used temporarily should be thoroughly cleaned before storage, and then sprayed with anti-rust lubricant, and then put into storage after the molds are tightly closed. No heavy objects are allowed on the mold.

(6) It is not allowed to hit any part in the mold with a hand hammer to prevent knock marks or deformation.

(7) The equipment is not used temporarily, and the mold on the injection should be coated with anti-rust oil. The movable and fixed molds are not allowed to be in a pressure-clamped state for a long time to prevent deformation under pressure.

主站蜘蛛池模板: 午夜影视免费x看| 亚洲精品一品区二品区三区| 亚洲区小说区激情区图片区| 人妻插b视频一区二区三区| 亚洲中文字幕无码不卡电影| 日韩精品人妻中文字幕有码| 日韩乱码在线观看免费视频网站| 自偷自拍亚洲综合精品麻豆| 国产无套精品一区二区| 久久99国产综合精品免费| 亚洲aⅴ在线无码天堂777| 国内精品久久久久影院蜜芽| 欧美天天拍在线视频| 国产免费无码一区二区三区| 日韩av高清在线观看| 最新国产aⅴ精品无码| 亚洲综合激情七月婷婷| 免费无码黄网站在线看| 777精品出轨人妻国产| 欧美三級片黃色三級片黃色| 国内嫩模私拍精品视频| 日韩熟女精品一区二区三区| 亚洲精品国产av成拍色拍个| 亚洲日本va在线视频观看| 人妻中出受孕 中文字幕在线| 国产综合精品一区二区三区| 国产区又黄又硬高潮的视频| 亚洲精品无码鲁网中文电影| 久久人妻少妇嫩草av无码专区| 亚洲不乱码卡一卡二卡4卡5卡| 国产成人片无码免费视频软件| 婷婷射精av这里只有精品| 色拍拍在线精品视频| 久青草影院在线观看国产| 天堂最新版在线www| 奇米影视第4色| 中文字幕日韩精品亚洲一区| 亚洲人成小说网站色在线观看| 少妇粉嫩小泬喷水视频www| 国产精品爽爽久久久久久竹菊| 欧美牲交视频免费观看|